Rojas AP was engaged by the Lewis Latimer House Museum to manage interior repairs while preserving the historic integrity of the landmarked structure. The project involved identifying repair areas, specifying materials, and coordinating efforts to meet ADA requirements and align with upcoming exhibition schedules. Special care was taken to protect the home’s historic elements and artifacts throughout the process.

Rojas AP coordinated the contractor selection process, organizing a pre-bid walkthrough with qualified contractors, reviewing proposals, and leveling bids to ensure alignment with project goals and preservation standards.

During construction, Rojas AP provided oversight, conducted regular site visits, and verified that all work adhered to the project’s specifications and historic preservation guidelines. The team also managed communications between the museum and contractor, addressed any issues that arose, and completed final inspections to ensure project completion to the museum’s satisfaction.

LOCATION
QUEENS, NY

Upper West Side Window Replacement

Upper West Side Window Replacement

Rojas AP was hired by the unit owner to coordinate Coop Board and Landmarks Preservation Committee (LCP) approval for the combination replacement and restoration of the 10th and 11th-floor windows. The owner wanted to replace the existing two-story window unit with a more energy-efficient one. The old unit was drafty and also allowed water to infiltrate the unit, causing deterioration of the existing steel frame and interior finishes. The scope was presented to the LPC Commission by the window contractor prior to Rojas AP’s involvement. The LPC granted approval for the replacement but required the window mullions to be reconfigured to a historical condition. Rojas AP was then hired to both satisfy the LPC requirements and allow the owner to keep the expanded view of Central Park. The solution Rojas AP proposed was to replace the 11th-floor window and spandrel section, but only repair the 10th-floor portion, thereby saving the desired mullion configuration. In addition to coordinating approvals with the LPC, Rojas AP was also in charge of reviewing the proposals, timelines, and payment applications from all professionals involved.